Industrial Projects

Pacifico Energy- Pacifico Spunky layout

General project areas for both Rain Lily solar & Bess- Pacifico spunky power plant, data center. Image based off of Hood county concept plans

Protect the Paluxy Valley Map- showing rough layouts of industrial projects- Data Centers, Power Plants, Battery Energy Storage Systems, Solar Farms.

Pacifico Energy- Pacifico Spunky layout
Click on Photo to see full Image
Pacifico Spunky
Power Plant/Battery Storage/
Data Center
Developer- Pacifico Energy
(Pacifico Spunky LLC)
862 Acre Site
16 Turbine Gas Power Plant
To power onsite data centers.
Utility Scale Lithium Battery Storage System. 9 Acre evaporation pond along the Brazos river.
Nearest Home 1500 ft.
-
TCEQ Air Permit approved
-
AMUD Water denied
-
Seeking Groundwater well permit from Upper Trinity Groundwater Conservation District
FM 2174 CR 309, Cleburne Hood County
Ft Spunky property along the Brazos and Ravenswood.
Click the links below to read the TCEQ Air Permit or Pacifico Spunky's Concept plan

Big Digital Energy - 10NetZero
50-acre site next to Rain Lily
Address: 2400 County Road 326
Planned development of an AI datacenter campus with possible power plant, potential capacity up to
300 MW
Site currently has 17 MW of operational power expected to support a phased expansion to as much as 111 MW of grid capacity.
Existing natural-gas infrastructure potential to add behind-the-meter generation.
Financial advisor: Northland Capital Markets
.png)
Project Red & Yellow
INFORMATION ON THE WAY
1598 Mitchell Bend Hwy, Granbury, TX 76048

Rain Lily Solar & BESS
Developer - European Energy
(EE North America)
810 Acre Site
Over 2,000 Acres Leased
-149 MW Solar farm (photovoltaic array)
Roughly 2 acres- 106 MW / 191 MWdc / 210 MWh Lithium Battery Energy Storage System (BESS).
-Electrical Switchyard
-Substation.
-
Hood County Informal Concept Plan approved
-
Left Option open for Power Plant
Ft. Spunky Area, County Road 326
Across from Pecan Clubhouse Along Bellechase & ravenswood Stretching towards Pacifico
Rain Lily Informal Concept Plan here
_edited.jpg)
Lydian - Yellow Viking 1
1,187 acres
Utility-scale Solar farm
Capacity of 171.13 MW
Location: Along the Brazos next to Pacifico Spunky power plant/ data center,
spans across portions of Somervell, Hood, and Johnson County, sitting just across from the Pecan Plantation community.
Timeline: The target date to bring this online is July 12, 2027.
Current Status: It is actively progressing through the ERCOT grid connection pipeline.

Apache Hill Battery Energy Storage System
201.15 MW
Mambrino Highway (FM 2425)- 2727 Mambrino Hwy, Granbury, TX 76048
-
Lithium Battery project near completion
Connection Points: 363 Hood 138kV
-
The project is currently active in the ERCOT (Electric Reliability Council of Texas) interconnection queue.
Black Mountain Sold to Vitis
OTher Names :APACHE HILL ENERGY CENTER. Proposed completion date is October 31, 2026.

Major AI Data Centers Across The U.S
According to recent data on the brockovichdatacenter.com website,
"A map of major AI data centers across the U.S. — operational, under construction, permitted, proposed and cancelled — overlaid with locations where community members have emailed in concerns. Click any marker for details, or use the layer switcher at the top right of the map to show and hide categories."
(brockovichdatacenter.com - Map Section 2, 2026)
Map Source: brockovichdatacenter.com - Map Section 2, 2026
_edited.jpg)
.png)